Flare: go-flare v1.15.1 hard fork patches a node vulnerability - 11 Nov 2026

CoinMarketCal

Flare: go-flare v1.15.1 hard fork patches a node vulnerability - 11 Nov 2026

Flare activates its go-flare v1.15.1 hard fork on 11 November 2026 at 14:00 UTC to patch a vulnerability in upstream node code. Validators and node operators must install go-flare v1.15.1 before the upgrade activates.The upgrade follows a flagged exploit attempt. Timely validator updates are required for the network to continue operating when the hard fork activates. User funds are stated to be unaffected.Flare is rolling out go-flare v1.15.1, a network upgrade that patches a vulnerability in the upstream code used by Flare nodes. The fix has already been tested. The hard fork activates on Nov 11 at 14:00 UTC. Validators and node operators: please upgrade as soon as possible.Why…